Golden Circle

Not verified. Claim this page

Golden Circle Sustainability Commitments

2023

Biogas Utilization Enhancement

Installing larger boiler at Northgate facility to increase biogas utilization from 30% to 90% of biogas produced during anaerobic wastewater treatment

2023

Coal Usage Reduction

Increase coal usage offset from 5% to 15% through enhanced biogas utilization for steam generation

About Golden Circle

  • Status
  • Unverified