HARE

Not verified. Claim this page

HARE Sustainability Actions

Started carbon benchmarking

Carbon Benchmark Benchmark with actual carbon that year so we knew exactly where we were at (this was totally voluntary as the ESOS reporting that is mandatory started 2014). 2010

Set reduction metrics

Reduction Metrics Set metrics for reduction (these would not be seen as ambitious now, but in 2011, with virtually no electric cars on UK roads and inadequate infrastructure to support reduction, these were ambitious for the time). 2011

Installed LED lighting

Lighting Updates Gradual implementation of LED lighting, replacing old sodium lighting in facilities, followed by offices. 2012-2015

Introduced travel schemes

Transport Schemes Bike to work and public transport season tickets were made available. 2013

Added shower and bike parking

Transport Partnership Partnered with Transport For Greater Manchester installing shower facilities at Brandlesholme and secure bicycle parking. 2014

Brought in hybrid vehicles

Hybrid Vehicles 2014 first Hybrid vehicle within the Group. 2014

Improved welding efficiency

Energy Efficient Welding Started replacing all old welding sets for better invertor sets that use less energy whilst welding. 2015

Improved leak detection

Leak Detection Improvements Leak detection on compressed air improved. 2016

Achieved Carbon Zero

Carbon Zero First UK Steelwork Fabricator to become Carbon Zero. Apr 2020